- Other Construction & Real Estate[1]
- Other Construction Material Making Machinery[10]
- Tile Making Machinery[1]
- Chemical Storage Equipment[10]
- Other Construction Machinery[4]
- Milling Machine[4]
- Machine Tool Spindle[4]
- Cranes[7]
- Hoists[6]
- Other Metal Processing Machinery[1]
- Cast & Forged[10]
- Other Metals & Metal Products[1]
- Other Steel Products[1]
- Stainless Steel Flats[1]
- Stainless Steel Strips[10]
- Steel Pipes[10]
- Flat Steel[1]
- Steel Angles[1]
- Steel H-Beams[7]
- Steel Round Bars[2]
- Steel Sheets[10]
- Steel Strips[10]
- Contact Person : Mr. Zeng Steven
- Company Name : Henan Anson Steel Co., Ltd.
- Tel : 86-372-5065802
- Fax : 86-372-5065803
- Address : Henan,Anyang,Suite E, 8/F Jinhao Business Bld., Remin Rd.
- Country/Region : China
- Zip : 455000
Related Product Searches:Hot-work Die Steel(H13),High Quality,hot-work die steel, die steel,H13
A:Specification
Product | Material | Spec.(mm) | Lengthmm) | Remark |
Hot Work Steels | H13 | Φ12-60 | 3000-5800 | Hot RolledAnnealed |
Hot Work Steels | Φ65-350 | 3000-5800 | Forging Annealed Polished | |
Hot Work Steels | Φ360-500 | 3000-5800 | PolishedAnnealed Electro-slag | |
Hot Work Steels | Φ340-650 | 3000-5800 | Smooth MachinedAnnealed Electro-slag | |
Hot Work Steels | H13 | 25-60*255-405 | 3000-5800 | Forging |
Hot Work Steels | 105-350*505-620 | 3000-5800 | Forging Electro-slag | |
Hot Work Steels | 30-48*510 | 3000-5800 | Electro-slag |
B: Performance Table
GeneralInformation | Very good retentively of hardness and toughness at elevated temperatures. Compression strength is very good and it is insensitive to thermal shocks. Wear resistance is than 2343. Good mechanical property in the annealed condition. |
ComparableStandards | AISI/SAE DIN W.N AFNOR JIS SIAU |
H13 X40CrMoV51 1.2344 / BH13 MTV | |
ChemicalAnalysis (%) | C Mn Si Cr Mo V P S |
0.37-0.42 0.30-0.50 0.90-1.20 4.80-5.50 1.20-1.50 0.90-1.10 ≤0.03 ≤0.03 |
Heat Treatment
ANNEALING:- heat to800, hold at temperature for 1/2 h to 1 h; - Furnace cooling to 780 and hold at temperature for at least 5 hours; - cool by 10/h to 750;- cooling in air.Maximum hardness:230 HB Stress relieving:To be carried out after machining and before the final heat treatment, - Heating to 650÷700, hold for 4÷6 hours;- cooling in air. Hardening ; - Initial preheating to350÷450;- Second preheating to 750÷850; - Heat to hardening temperature in the range 1000÷1050 and hold at temperature; -Cooling in air. Quenched hardness: 52÷56HRC Tempering: In the range 550÷630 for at least 3 hours according requirements and conditions of use. Tempering must be repeated a second time at a temperature to or 20 lower than the previous. Before tempering, preheat the parts to 200÷300.
Hot-work Die Steel(H13)