- Other Construction & Real Estate[1]
- Other Construction Material Making Machinery[10]
- Tile Making Machinery[1]
- Chemical Storage Equipment[10]
- Other Construction Machinery[4]
- Milling Machine[4]
- Machine Tool Spindle[4]
- Cranes[7]
- Hoists[6]
- Other Metal Processing Machinery[1]
- Cast & Forged[10]
- Other Metals & Metal Products[1]
- Other Steel Products[1]
- Stainless Steel Flats[1]
- Stainless Steel Strips[10]
- Steel Pipes[10]
- Flat Steel[1]
- Steel Angles[1]
- Steel H-Beams[7]
- Steel Round Bars[2]
- Steel Sheets[10]
- Steel Strips[10]
- Contact Person : Mr. Zeng Steven
- Company Name : Henan Anson Steel Co., Ltd.
- Tel : 86-372-5065802
- Fax : 86-372-5065803
- Address : Henan,Anyang,Suite E, 8/F Jinhao Business Bld., Remin Rd.
- Country/Region : China
- Zip : 455000
Related Product Searches:Alloy Mould Steel,High Quality,alloy mould steel, hot work tool steel,D2
A:Specification
Product | Material | Spec.(mm) | Lengthmm) | Remark |
Cold Work Steels | D2 | Φ12-130 | 3000-5800 | Hot RolledAnnealed |
Cold Work Steels | Φ65-420 | 3000-5800 | Forging Annealed Polished | |
Cold Work Steels | Φ114-305 | 3000-5800 | Forging Annealed Smooth Machined | |
Cold Work Steels | D2 | 25-60*255-405 | 3000-5800 | Forging |
Cold Work Steels | 100-150*610 | 3000-5800 | Forging Electro-slag | |
Cold Work Steels | 180-350*620 | 3000-5800 |
B: Performance Table
GeneralInformation | Steel with hardening air, oil and salts bath. It features good resistance and toughness for hot and treatments. Normally used for mould carrier frames, containers for pressure casting, sub-dies for extrusion of aluminum, plastic moulds. |
ComparableStandards | AISI/SAE DIN W.N AFNOR BS SIAU |
D2 X155CrVMo12_1 1.2379 Z160CDV12 BD2 KORV | |
ChenicalAnalysis (%) | C Mn Si Cr MO V P S |
1.50-1.60 0.15-0.45 0.10.40 11.0-12.0 0.60-0.80 0.90-1.10 ≤0.03 ≤0.03 |
Heat Treatment
Isothermal annealing:Heat to 850÷880;Funace cooling to 770 and hold at temperature for at least 10 hours;Cool by10/h to 720;Cooling in air.
Stress relieving :To be carried out after machining and befor the final heat trestment,-Heat to 650÷700 , hold for 4/6 hours ;-Furnace cooling to 330÷350 -Cooling in airHardening : -Initial preheating to 350÷450;-Second preheating to 750÷850 in sait bath at 850;-Austenitizing at 960÷100;-Cooling in air or in oil if large parts.Quenched hardness:64÷65HRCTempering:In the temperature range 150÷300 with minimum holding time 3h. For parts hardened at 1080÷1100, a first will be carried out at 500÷550 in order to expioit secondary handness, foliowed by a second tempering at 180/300
Alloy Mould Steel